{"id":15,"date":"2022-09-06T22:01:36","date_gmt":"2022-09-06T22:01:36","guid":{"rendered":"https:\/\/ilmenit.hu\/?page_id=15"},"modified":"2022-09-20T22:23:42","modified_gmt":"2022-09-20T20:23:42","slug":"referenciak","status":"publish","type":"page","link":"https:\/\/ilmenit.hu\/en\/references\/","title":{"rendered":"References"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Energy<\/h2>\n\n\n\n<div class=\"wp-block-group table-wrapper\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<table class=\"wp-block-advgb-table advgb-table-frontend\"><thead><tr><th>Client<\/th><th>Project \/ Location<\/th><th>Activity<\/th><th>Date<\/th><\/tr><\/thead><tbody><tr><td>UNIPER GmbH<\/td><td>BC Power Kft.<br>BorsodChem power plant<br><em>Kazincbarcika<\/em><\/td><td>Site Construction Supervision<\/td><td>2021-<\/td><\/tr><tr><td rowspan=\"2\">Hamburger-Hung\u00e1ria<br>Kft.<\/td><td>Biomass power plant main steam pipe measurment pipe replacement<br><em>Duna\u00fajv\u00e1ros<\/em><\/td><td>Welding supervision<\/td><td>2018<\/td><\/tr><tr><td>Biomass power plant BoP system<br><em>Duna\u00fajv\u00e1ros<\/em><\/td><td>Technical supervision, inspection and welding supervision<\/td><td>2015<\/td><\/tr><tr><td>APOLLO TYRES<br>Hungary Kft.<\/td><td>Plant energy systems construction, BOP systems<br><em>Gy\u00f6ngy\u00f6shal\u00e1sz<\/em><\/td><td>Site Construction Supervision, welding supervision<\/td><td>2017-2018<\/td><\/tr><tr><td>\u00c9MI-T\u00dcV S\u00dcD Kft.<\/td><td>Sinergy TVK power plant new boiler piping<br><em>Tisza\u00fajv\u00e1ros<\/em><\/td><td>Technical supervision of piping installation<\/td><td>2017<\/td><\/tr><tr><td rowspan=\"2\">John Cockerill kor\u00e1bbi CMI, Belgium<\/td><td>1300 tons steel structure manufacturing of HRSG<br><em>Siedlce, Lengyelorsz\u00e1g<\/em><\/td><td>QA\/QC inspections<\/td><td>2015-2017<\/td><\/tr><tr><td>Dunamenti Power Plant G3 400 MW boiler<br><em>Sz\u00e1zhalombatta<\/em><\/td><td>QA\/QC of boiler piping prefabrication and site installation<\/td><td>2009-2010<\/td><\/tr><tr><td>Paksi Atomer\u0151m\u0171 Zrt.<\/td><td>Supplier audit, remote<\/td><td>Supplier audit<\/td><td>2011-2012<\/td><\/tr><tr><td>ALSTOM Hungary Kft.<\/td><td>Dunamenti Power Plant<br>modernization of steam turbine<br><em>Sz\u00e1zhalombatta<\/em><\/td><td>Welding supervision and counseling<\/td><td>2010<\/td><\/tr><\/tbody><\/table>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Chemical Industry<\/h2>\n\n\n\n<div class=\"wp-block-group table-wrapper\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<table class=\"wp-block-advgb-table advgb-table-frontend\"><thead><tr><th>Client<\/th><th>Project \/ Location<\/th><th>Activity<\/th><th>Date<\/th><\/tr><\/thead><tbody><tr><td rowspan=\"4\">\u00c9MI-T\u00dcV S\u00dcD Kft.<\/td><td>BorsodChem Anilin, MNB plants construction<br><em>Kazincbarcika<\/em><\/td><td>Technical inspection of piping and equipments installation<\/td><td>2021-ongoing<\/td><\/tr><tr><td>BorsodChem HPM plant construction<br><em>Kazincbarcika<\/em><\/td><td>Technical inspection of piping and equipments installation<\/td><td>2020<\/td><\/tr><tr><td>BorsodChem MCCP4 plant construction<br><em>Kazincbarcika<\/em><\/td><td>Technical inspection of piping and equipments installation<\/td><td>2018-2019<\/td><\/tr><tr><td>BorsodChem MDD Debott maintenance and capacity extension<br><em>Kazincbarcika<\/em><\/td><td>Technical inspection, mechanical<\/td><td>2011<\/td><\/tr><tr><td>CH-PLUSSZ 2000 Kft.<\/td><td>BorsodChem TDI-2 plant construction<br><em>Kazincbarcika<\/em><\/td><td>Site construction and welding coordination<\/td><td>2010-2011<\/td><\/tr><\/tbody><\/table>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Gas- and Oil Industry<\/h2>\n\n\n\n<div class=\"wp-block-group table-wrapper\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<table class=\"wp-block-advgb-table advgb-table-frontend\"><thead><tr><th style=\"vertical-align:middle;text-align:left\">Client<\/th><th>Project \/ Location<\/th><th>Activity<\/th><th>Date<\/th><\/tr><\/thead><tbody><tr><td rowspan=\"4\">\u00c9MI-T\u00dcV S\u00dcD Kft.<\/td><td>MOL Petrolk\u00e9mia, Olefin-1 reconstruction<br><em>Tisza\u00fajv\u00e1ros<\/em><\/td><td>Technical inspection of equipment repair, manufacturing; pipe rack piping replacement, flare changing, etc.<\/td><td>2019<\/td><\/tr><tr><td>MOL Petrolk\u00e9mia, Olefin-1 reconstructionof boiler<br><em>Tisza\u00fajv\u00e1ros<\/em><\/td><td>Radiographic film interpretation<\/td><td>2016<\/td><\/tr><tr><td>MOL Petrolk\u00e9mia, Butadi\u00e9n Extract plant, 3x2500m<sup>3<\/sup> sphare tanks and 2 cells coolin tower construction<br><em>Tisza\u00fajv\u00e1ros<\/em><\/td><td>Technical inspection (mechanical, steel structure, painting and insulation)<\/td><td>2014-2015<\/td><\/tr><tr><td>Pannon Crushed seed oil plant construction<br><em>Fokt\u0151<\/em><\/td><td>Technical inspection, supervision<\/td><td>2011-2012<\/td><\/tr><tr><td>Hamburger-Hung\u00e1ria<br>Kft.<\/td><td>Biogas plant capacity extension<br><em>Duna\u00fajv\u00e1ros<\/em><\/td><td>Mechanical and welding supervision<\/td><td>2016<\/td><\/tr><tr><td>Petrolszerv\u00edz Kft.<\/td><td>SZBT-1 strategy gas storage plant dew point unit installation<br><em>Sz\u0151reg<\/em><\/td><td>Technical and welding counseling<\/td><td>2009<\/td><\/tr><tr><td>Kevi\u00e9pszer Kft.<\/td><td>DN1400\/DN1000 stategy gas pipeline<br><em>Beregdar\u00f3c-Hajd\u00faszoboszl\u00f3<\/em><\/td><td>Welding coordination<\/td><td>2008<\/td><\/tr><\/tbody><\/table>\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Other activities, assignments<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Third party inspections on behalf of different Clients (Inspection companies, main contractors, End user clients, etc.): FAT at manufacturer plant, preinspection of manufacturing plant, product inspection before tranportation, etc. countinously within Hungary and abroad (since 2013)<\/p>","protected":false},"excerpt":{"rendered":"<p>You can read about our activities so far and our completed works here.<\/p>\n","protected":false},"author":1,"featured_media":70,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","footnotes":""},"class_list":["post-15","page","type-page","status-publish","has-post-thumbnail","hentry"],"coauthors":[],"author_meta":{"author_link":"https:\/\/ilmenit.hu\/en\/author\/dev\/","display_name":"dev"},"relative_dates":{"created":"Posted 4 years ago","modified":"Updated 4 years ago"},"absolute_dates":{"created":"Posted on 2022.09.06.","modified":"Updated on 2022.09.20."},"absolute_dates_time":{"created":"Posted on 2022.09.06. 22:01","modified":"Updated on 2022.09.20. 22:23"},"featured_img_caption":"","featured_img":"https:\/\/ilmenit.hu\/wp-content\/uploads\/2022\/09\/featured-referenciak.webp","series_order":"","_links":{"self":[{"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/pages\/15","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/comments?post=15"}],"version-history":[{"count":27,"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/pages\/15\/revisions"}],"predecessor-version":[{"id":156,"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/pages\/15\/revisions\/156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/media\/70"}],"wp:attachment":[{"href":"https:\/\/ilmenit.hu\/en\/wp-json\/wp\/v2\/media?parent=15"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}